The Beginning of Central Station Service

[NOTE: This article was first developed as a PowerPoint presentation by Craig A. Woodworth, IEEE Life Member (a.k.a Cawoody), for a joint meeting of the Buffalo Section IEEE and the Buffalo & Erie County Historical Society on April 14, 2004.]

The City of Buffalo is located in western New York State at the junction of Lake Erie and the Niagara River. It is approximately ten miles north-to-south and six miles east-to-west with an area of 42 square miles. Niagara Falls is located 20 miles north of the city [Fig. 1.1]. In 1900 Buffalo, with a large commercial and industrial base, was the eighth largest city in the United States.

Buffalo, the Queen City of the Lakes, was an up-to-date city at the end of the 19th century and electric lights were in the forefront.  "I went to the city to see the great sights and there I saw what they call ‘lectric lights. Now I think I know what I’m talking about ‘cuse they put them up in bottles and you can’t blow them out.[1] [Fig. 1.2]

The earliest electric lights were arc lights.[2] The electric discharge between two carbon or other type electrodes gave a brilliant light suitable for lighting streets, large stores and halls but not homes [Fig. 1.3].[3] Arc lights for street lighting were usually on constant-current series circuits [Fig. 1.4].

Charles Brush was a pioneer in the development of arc lights [Fig. 1.5].[4] In July 1881 the Brush Electric Light Company of Buffalo installed the first electric plant in Buffalo on Ganson Street along the City’s waterfront [Fig. 1.6].[5] A 30-hp steam engine driving a generator with a capacity of forty 2,000-candlepower arc lamps supplied twelve carbon arc lights extending a mile along the street. In August a second station was built in the New York Central Railroad’s Chicago St. roundhouse supplying thirteen arc lights in the Exchange Street Depot [Fig. 1.7]. A third station was added in 1882 at Wilkeson and Mohawk Streets near the present City Hall to extend arc lighting service to many other streets, churches, public meeting places, hotels and other business places [Fig. 1.8]. The Buffalo Electric Light and Power Company also had its machines installed at Brush’s Wilkeson Street Station. This location was used as an electric company station for 120 years.

In October 1881 the United States Electric Lighting Company gave a lighting exhibition in a factory building at 296 Washington Street and installed ten lamps in the J. N. Adams store in November. In 1883 this company placed two direct current machines in Brush’s Wilkeson Street Station for the first incandescent lamps installed in Buffalo.[6] Edison had developed the first practical electric incandescent lamp four years earlier [Fig. 1.9].

Other companies joined the lighting rush. In 1885, the United States Electric Light and Power Company of Buffalo had a plant for arc lighting in the Black Rock section of the City [Fig. 1.10].[7] In 1887, the Thomson-Houston Light and Power Company of Buffalo had a plant for arc lighting located on Effner Street and later moved downtown to 40 Court Street.[8]

The Buffalo General Electric Company was formed August 1, 1892 as a consolidation of the Brush Electric Light Company of Buffalo and the Thomson-Houston Electric Light and Power Company of Buffalo, which had combined with two of the previously mentioned companies [Fig. 1.11].[9]

Advent of Alternating Current

In September 1882, the Pearl Street Station of the Edison Electric Illuminating Company in New York City went into operation serving 85 customers with some 400 incandescent lamps [Fig. 2.1]. This central station system, which was designed to serve an area approximately one-mile square, consisted of constant voltage direct current generators connected in parallel serving radial circuits with lamps connected in parallel.[10] 110 volts was selected on the basis of economics with copper being the largest cost [Fig. 2.2].[11]It is remarkable that in the last century the voltage has been adjusted upward only slightly to today’s standard of 120 volts. 

The next important development came less than one year later in July 1883 when a three-wire system went into operation in Sunbury, Pennsylvania with a 62 1/2 percent saving in copper compared to the New York system [Fig. 2.3].[12] To serve the same load with two generators connected in series, the current is cut in half. The neutral current is zero with equal loads on both generators. Direct current systems had three major disadvantages:

  1. Generation had to be located reasonably close to the load due to the voltage drop, which required large size wire.
  2. Generation had to be at utilization voltage.
  3. Low utilization voltage meant high currents and high currents meant high losses in the distribution lines.

The adoption of alternating current systems overcame these disadvantages. While Edison was improving the dc system, others were developing the alternating current system, which, by using transformers, could raise the generation voltage and utilize small conductors for distribution, then lower the voltage for loads remote from the generation [Fig. 2.4]. The safety problem of a transformer insulation breakdown applying high-voltage to the secondary was solved by the simple but effective expedient of grounding the transformer secondary winding.[13]

The first alternating current central station to operate commercially in the United States was placed in service in Buffalo on November 30, 1886 only four years after Edison’s Pearl Street Station. It was a Westinghouse 400 lamp single-phase (or two-wire) system with a primary of 1000 volts. The generator was located in the Brush Electric Light plant at Wilkeson and Mohawk Streets. One customer was the Adam, Meldrum & Anderson department store on downtown Main Street, now the site of the Main Place Mall.[14]

The following year in Montpelier, Vermont an ac system replaced a dc system and the value of the copper salvaged was enough to cover the cost of conversion.[15] Also in 1887 a French syndicate was gaining a monopoly on the world’s copper supply and forced up the price nearly 70 percent.[16] This made ac systems, which used smaller conductors, more attractive. And you thought that technology changed fast only in recent years! How’s your five-year-old computer doing?

Early ac systems had one major disadvantage: there was no commercially available ac motor. This shortcoming was solved in fairly short order. On May 1, 1888 Nikola Tesla [Fig. 2.5] was issued his first set of patents for a comprehensive system of generators, transformers, synchronous motors and induction motors for the transmission and utilization of two or more alternating currents -- what came to be known as the polyphase system. Two months later, George Westinghouse [Fig. 2.6] acquired the patent rights and Tesla’s services.

During development of the polyphase motor it was found necessary to reduce the alternations from 133 Hz. or cycles per second (the more or less standard frequency for the early single-phase systems) to 60 Hz. This remains the standard North American frequency. Tesla also developed several “split phase” designs for motors for the single-phase systems.

Developing a Renewable Energy Source

The early Buffalo systems probably all had a common arrangement: a coal fired boiler with a reciprocating steam engine of a couple hundred horsepower maximum, belt connected to a generator that served an area of about a square mile [Fig. 3.1]. What other source of energy was available?

The greatest source of renewable energy on the Niagara Frontier is at Niagara Falls. The energy of the falling water has been estimated at six million horsepower. The story of the development of the Hydraulic Canal to provide waterpower for industries at the brink of the Niagara gorge and its purchase by the Schoellkopf interests in 1877 will not be repeated here [Fig. 3.2]. Note that the industries used only a portion of the available head of water [Fig 3.3].

In 1885 the State of New York acquired all the land for about a mile upstream and a quarter-mile downstream from the American Falls plus all the islands for a State park [Figure 3.4]. This removed all the readily available waterpower sites except for the Hydraulic Canal. How could more of this renewable energy be utilized?

In February 1886 Thomas Evershed, a division engineer on the Erie Canal, developed a plan to construct a series of canals from the Niagara River and sell mill sites on both sides of the canals. Water would be drawn from a canal, run through a waterwheel and discharged into a tailrace tunnel that would run into the Gorge [Fig. 3.5]. The profile shows the canals and wheel pits [Fig. 3.6]. A total of 238 mills of 500 hp each could be developed.[17] This would be 119,000 hp or more than the total of all the developed hydropower in eastern New York and New England combined.[18]

In June 1886 the Niagara River Hydraulic Tunnel, Power & Sewer Co. was organized to pursue the Evershed plan.[19] It was chartered by the State of New York and later authorized to take water from the Niagara River sufficient to produce 200,000 hp.[20] The Prospectus stated “It is conceded by leading practical electricians that it would be entirely practicable now to light the City of Buffalo (distance 20 miles) with power furnished by Niagara Falls,… An application has already been received from a manufacturer in Birmingham, England, for an opportunity to test his apparatus for conveying power by means of compressed air.”[21] Various attempts to finance the project proved futile. In July 1887 a number of enterprising citizens of Buffalo provided a cash prize of $100,000 for a practical method of using Niagara power in Buffalo [Fig. 3.7].[22] None of the projects submitted merited the prize. In 1889 the ‘Tunnel” company, through attorney William Rankine, got the attention of J. P. Morgan and Edward Dean Adams, a New York City attorney and investment banker [Fig. 3.8]. Adams consulted the renowned mechanical engineer Dr. Coleman Sellers [Fig. 3.9]. Sellers reviewed the Evershed prospectus and informed Adams that the plan was financially feasible.[23] In December 1889 a syndicate of financiers organized The Cataract Construction Company with Adams as president. The Cataract company acquired all the stock of the “Tunnel” company and would act as its business and financial agent.[24] The Cataract company was designed to represent all the money subscribers to the enterprise and to be the means of their profiting by its contract with the “Tunnel” company for the design and construction of the project. This speculative venture was expected to be slow in developing. The organization of capitalists and engineers became an association of adventurers and pioneers.[25] In late 1889 the “Tunnel” company’s name was changed to The Niagara Falls Power Company [Fig. 3.10].[26]

Difficulties with the Evershed plan soon appeared. The construction of over five miles of tunnel and 238 wheel-pits practically all by rock excavation in hard limestone indicated the economy of fewer wheel-pits and shorter tunnels and inlet-canals.[27] Questions arose:[28]

1. Was the old plan of placing a mill over or near its own water wheel adaptable to a project of unprecedented magnitude, or could power produced at one place be supplied to several customers?

2. Could power be distributed locally or transmitted a considerable distance by shafts or belts or wire ropes, by compressed air or water pressure, or by electricity?

3. Could Buffalo, with a population of 255,000, compared to 5,000 in Niagara Falls, be reached by any practical method? Edison was asked and replied “No difficulty transferring unlimited power.” He proposed connecting several dc generators in series at Niagara Falls to obtain 6,000 volts, utilizing underground cable across Grand Island and connecting several dc motors in series in Buffalo.[29] Westinghouse advocated compressed air.[30] Compressed air had an advantage in that it could be used in place of steam in many existing steam engines.[31]

Consultants were engaged including Clemens Herschel, an hydraulic engineer who had extensive experience on American waterpower projects [Fig. 3.11] and Professor Henry Rowland, a physicist from Johns Hopkins University who was to determine if the project was economically feasible [Fig. 3.12]. Professor Rowland reported “.. the practical and commercial problem is of a different nature than the scientific one and may be stated thus: at what distance from cheap water-power can such power, transmitted electrically, compete with steam in cost and certainty of operation?”[32] New methods were called for; power was to be produced on an unprecedented scale. Nothing in existence was adequate to accomplish these results.[33]

In the midst of all this doubt, the Construction company did what any self-respecting organization does; in July 1890 they formed a committee. But what a committee! It was named the International Niagara Commission and consisted of E. Mascart (Professor, College of France), William Unwin (Professor, Central Institute London, England), Sir William Thomson (later Lord Kelvin; University of Glasgow, Scotland), Dr. Coleman Sellers (Professor, Stevens Institute and Franklin Institute, United States), and Theodore Turrettini (President, City of Geneva, Switzerland and a waterpower engineer) [Fig. 3.13].[34]

The Commission investigated the state of the art of power transmission in the United States and Europe and also sent out invitations offering a monetary prize for plans for hydraulic development and power transmission and distribution including 50,000 hp to Buffalo.[35] Competitors from six countries submitted seventeen proposals. Three were rejected as irregular.[36] Of the eight projects presented for power transmission, only four proposed electrical methods [Fig. 3.14]. Two advocated direct current and two alternating current; one single phase and one polyphase.[37] Westinghouse refused to submit a proposal remarking “These people are trying to secure $100,000 worth of information by offering prizes, the largest of which is $3,000. When they are ready to do business, we will show them how to do it.”[38] Prizes were awarded in early 1891. No first prize was awarded for a combined project for hydraulic development and distribution. In the opinion of the Commission, no project could be recommended for adoption without considerable modification.[39] The Commission’s report takes up 53 pages in Volume I of Edward Dean Adams’ book ‘Niagara Power’ and provides interesting reading.[40]

Niagara Falls Hydraulic Development - Adams Station

‘Fast tracking’ a building where the foundation is completed before the design of the upper floors is complete is a common current practice. This principle was applied to construction of the Adams Station.  Because a tailrace tunnel was common to any project, a contract was awarded in September 1890. Construction of the 1-1/4 mile long tunnel commenced in October 1890 and was completed in December 1892 [Fig. 4.1]. A horseshoe shape 21 feet high and 18.8 feet wide was selected [Fig. 4.2]. During construction through the weak Rochester shale strata, it became necessary to line the tunnel using a total of sixteen million bricks in four courses set in Portland cement. A profile of the tunnel shows the extent of the shale [Fig. 4.3].

By July 1891 plans had reached the following stage:[41]

1. Hydraulic system consisting of a single inlet canal, the shortest possible tailrace tunnel, and a central station for power development. The turbine units should be large and mounted at the bottom of the wheel pit. Their complementary machines, whether pumps, compressors or generators should be mounted on the top of the same rotating shaft so as to constitute a unit of power. [Fig. 4.4]

2. Local distribution of power by direct current of electricity.

3. Transmission of power to Buffalo by compressed air.

The inlet canal was started in August 1891 and completed in October 1892 [Figure 4.5]. The 20 feet wide and 182 feet deep stone masonry wheel pit was started in late 1891 and completed in January 1894 [Fig. 4.6].[42]

The state of the art of electric power transmission in the early 1890’s was as follows:[43]

1. 1890 - Willamette Falls to Portland, Oregon - 4,000 volts ac single-phase 12 miles for lighting.

2. 1891 - Telluride, Colorado - 3,000 volts ac single-phase three miles supplying a 100-hp synchronous motor for operating an ore crushing plant.

3. 1891 - Lauffen to Frankfurt, Germany - Experimental 30,000 volt three-phase line 108 miles for 300 hp for the Frankfort Exposition. Overall efficiency 77 percent.

In early autumn of 1891 it became evident that alternating current could be safely and economically controlled for the transmission of power more than five times the distance from Niagara to Buffalo. From this period, all serious attention was concentrated upon electrical installations; generators, transformers, transmission lines, motors, and power and light distribution.[44]

In December 1891 an invitation to submit proposals for generation of electrical energy for local lighting and power purposes was sent to three United States and three Swiss electrical equipment designers and manufacturers. The invitation did not mention direct current, alternating current or voltage. It took a year until all proposals were received.[45]

In 1892 Professor George Forbes, an electrical engineer from England, was hired as a consultant [Fig. 4.7]. He had submitted the polyphase alternating current electrical proposal to the International Niagara Commission contest.[46] Horsepower and speed were determined by consultation with the hydraulic turbine and electrical equipment manufacturers.[47] The contemplation of the use of electricity from hydraulic units of 5000 hp in a plant, which would ultimately aggregate 100,000 hp, required imagination, optimism and confidence. 100,000 hp approximated the output of all the electric lighting stations in the United States.[48]

In July 1892 a contract was awarded to Faesch & Piccard of Geneva, Switzerland for complete working drawings of a 5000-hp 250-revolutions-per-minute hydraulic turbine including the governor.[49] The turbines far exceeded in power and speed any then in existence.[50] Transportation costs and import duties made domestic manufacture economical.[51] In November 1892 a contract was awarded to I. P. Morris of Philadelphia for two turbines. A third was added in 1893.[52] The turbines were double runner Fourneyron type with outward discharge directly into the wheel pit [Fig. 4.8 & 4.9]. There were no draft tubes. Water pressure on the top runner supported a large portion of the weight of the revolving parts of the units, the remainder being carried by a collar thrust bearing.[53] The mechanical governors, which were made in Switzerland by Faesch & Piccard, regulated the flow of water by raising or lowering a circular collar placed outside the turbine discharge.[54] The variation in speed would not exceed two percent normally or four percent with a 25 percent variation in load.[55] This speed variation would be totally unacceptable today.

The New York City architectural firm of McKim, Mead & White was engaged to design the limestone powerhouse [Fig. 4.10].[56]

Adams Station - Electric Development

It is interesting that in late 1892 the turbines were ordered four months before all the proposals were received for generators for local lighting and power. This was the era of the ‘Battle of the Currents’ with Edison as the leading proponent of direct current and with Westinghouse and others promoting alternating current. When the first execution by electricity took place in 1890 in New York State’s Auburn Prison, an ac electric chair was used. Dc proponents said the condemned murderer had been “Westinghoused.”[57]

The opportunity for a large scale demonstration of the alternating current system to dispel fears about the system’s high voltages and display its versatility came in the spring of 1892 when bids were taken to light the grounds of the Columbian Exposition to be held in Chicago in 1893 [Fig. 5.1]. Westinghouse astounded everyone by bidding about one-third of the bid submitted by the recently formed General Electric Company. GE held the Edison incandescent lamp patents, a seeming crippling handicap. However, Westinghouse owned the rights to an 1880 Sawyer-Man patent for a two-piece lamp, which had a glass globe and a cork-like ground glass stopper that didn’t infringe on the Edison patents [Fig. 5.2]. In less than a year Westinghouse built a factory and produced a quarter million of these “stopper” lamps [Fig. 5.3].

The Exhibition used more electricity than the whole City of Chicago. The central-station plant that supplied the fair consisted of twelve two-phase generators rated 750 kW, 60 Hz, 2000 to 2300 volts, belt driven or direct driven by five reciprocating steam engines [Fig. 5.4]. The Westinghouse exhibit in Machinery Hall was the largest plant of the Tesla polyphase system operating at that time. In addition to the lighting plant, there was an exhibit of a complete polyphase system which showed power could be transmitted great distances, and then be utilized for various purposes. Taking power from the 60-Hz fair circuits was a 500-hp motor that drove a two-phase 500-hp, 30-Hz, 400-volt generator Fig. 5.5]. This powered a 400 volt-to-10,000 volt step-up transformer, a short ‘transmission’ line, and a step-down transformer which ran induction motors, a synchronous motor plus a rotary converter for changing alternating current to direct current.[58] The converter had a rotating armature with four slip rings for the two-phase ac and a commutator for the dc [Fig 5.6].[59]

The Westinghouse polyphase exhibit was a big attraction when the Columbian Exhibition opened in the spring of 1893. Wooden models of the hydraulic turbines and governors under construction for Niagara Falls were also exhibited.[60] Representatives of the Cataract company had attended demonstrations of polyphase equipment at the Westinghouse factory and on May 6, 1893 adopted polyphase alternating current for both local use and transmission to Buffalo.[61]

Complications of the electrical design delayed awarding a contract for the generators. Transportation costs, import duties and patent questions removed the foreign manufacturers from competition.[62] The generator designs submitted in March 1893 by Westinghouse and General Electric did not fulfill the conditions imposed by the turbine designers for angular momentum and limited weight. On August 10, 1893 new bids were requested based on a design by Professor Forbes of the Cataract company for a 20,000 volt two-phase generator with an external rotating field of the “umbrella” type whereas a rotating armature was standard practice [Fig. 5.8].[63] Figure 5.9 shows the rotating field ring with the field poles and field windings. The armature winding was stationary. Westinghouse proposed two-phase; General Electric recommended three-phase.[64] Two-phase four-wire was selected because it was expected that much of the local load would be single-phase.[65] Next the frequency had to be selected. Hydraulic turbines had been ordered with a speed of 250 rpm. The frequencies possible at 250 rpm were: 16 2/3-Hz with 8 poles on the rotating field; 25-Hz with 12 poles; 33 1/3-Hz with 16 poles and 41 2/3- Hz with 20 poles. Low frequencies were preferred for large motors and rotary converters. Professor Forbes preferred 16 2/3- Hz for the commutating type ac motors then in use. Higher frequencies were more suitable for incandescent and arc lights. Tests had shown that at 25 Hz incandescent lamps did not show objectionable flickering. Westinghouse had adopted 60 Hz for lighting and 30 Hz for power and refused to guarantee efficiency at less than 30 Hz. General Electric recommended 41 2/3 Hz. Following a dinner meeting in October in New York City with Westinghouse representatives, President Adams of the Cataract Company asked Westinghouse’s chief electrical engineer if they could build and guarantee a 25-Hz generator.

Later in October revised proposals were received from Westinghouse and General Electric. Changes had to be made in the Forbes design. A 20,000-volt oil-cooled armature was not practical.[66] On October 26 a contract was placed with Westinghouse for three 5000-hp, 25-Hz, 2200 volt, two-phase, four-wire generators.[67] Figure 5.10 shows a view of a generator armature at the Westinghouse factory. The armature conductors were insulated with mica, which was a fortunate choice because thermocouple tests in later years showed temperatures as high as 225C. Figure 5.9 shows a nickel steel field ring with two of the twelve poles and coils. Adams ‘Niagara Power’ book contains many pages detailing the design, manufacture, testing and installation of these pioneering generators along with the auxiliary electrical apparatus including exciters, measuring instruments and switching devices [Fig 5.11]. The testing of the first machine at the Westinghouse plant in Pittsburgh was probably the origin of the cardinal rule “Never place a short circuit on a piece of rotating machinery.” This was done during testing with great disturbance to the windings.[68]

The first turbo-generator was successfully tested and operated in April 1895 [Fig 12].[69] The tall gentleman, No. 7, is John Jacob Astor and No. 8 is Edward Dean Adams, President. Schallenberger of Westinghouse designed a new type of switchboard indicating and integrating meters. On August 26, two-phase four-wire 2200 volts was first delivered commercially one-half mile to the Pittsburgh Reduction Company for reducing aluminum ore using the Hall process.[70] This company became ALCOA, the Aluminum Company of America. The Carborundum Company, maker of silicon carbide abrasives, was another early customer. The Forbes Subway, that served these early customers, was a concrete tunnel with cast iron racks on both walls for supporting the four copper conductor, rubber insulated, lead-covered cables in each circuit [Fig 13].[71]

The use of low cost Niagara power enabled these companies, and other soon to follow metallurgical and chemical companies, to greatly reduce the cost of their products. Aluminum is a classic example. In the mid 1800’s Napoleon III had a set of aluminum forks and spoons made for his most honored guests; less important guests used gold or silver tableware.[72] In 1884 the cap for the Washington Monument was a 6¼-pound piece of aluminum, the largest made to that date in the United States. During 1905 and 1906 the Niagara, Lockport and Ontario Power Company used about 260 tons of aluminum overhead conductors to transmit Niagara power to Syracuse [Fig. 14].[73] By October 1896, when the third 5000-hp turbo-generator was placed in operation, the demand for electricity locally exceeded the capacity.[74] Arrangements were made for additional capacity.[75]

Niagara to Buffalo Transmission Lines

In the late 19th century about 400 steam boilers rated 33,500 hp were installed in Buffalo. With coal at about $2 per ton, the price for electric power to be competitive could be estimated.[76] Potential customers included the street railway companies that had earlier converted from horse cars to electric trolleys like the one shown here in front of Buffalo Street Railway Company’s Stable No. 2 [Fig. 6.1].

On January 14, 1896, after much difficulty, the City of Buffalo granted an electricity distribution franchise to the Niagara Falls Power Company; municipal ownership had been rejected. In June the franchise was assigned to the newly incorporated Cataract Power and Conduit Company, which was jointly organized by Niagara Falls Power and Buffalo General Electric for the purpose of the sale and distribution of electricity in Buffalo at wholesale [Fig. 6.2].[77] Transmission franchises were secured from the various municipalities between Niagara Falls and Buffalo.[78]

Proposals for equipment to transmit 10,000 electrical horsepower from Niagara Falls to Buffalo were received from Westinghouse and General Electric. General Electric was awarded the contract for the design and construction of the transformer station in Niagara Falls, the transmission line to Buffalo and the transformer station in Buffalo, including the rotary converters to provide direct current for trolley service.[79]

Two single-phase air-cooled or ‘air blast’ 930-kW transformers were installed at Niagara [Fig. 6.3}. They were Scott connected from 2-phase 4-wire 2200-V to 3-phase 3-wire 11,000-V [Fig. 6.3].[80] The ‘Tee’ connection of the two high voltage windings gives three phase [Fig. 6.4].

The 22-mile transmission line consisted of cedar wood poles with 12 foot pine crossarms supporting three 350,000-cmil, 19 strand, bare copper conductors [Fig. 6.5]. The arrangement on the crossarms was originally 18 inch horizontal spacing but was changed to 36 inch triangular spacing to deter vandals who threw short pieces of wire across two or more conductors causing short circuits [Fig. 6.6].[81] Insulators proved to be a big problem. The first ones were dry process porcelain, which passed a 40,000 V dry test but were porous. About 40,000 of these insulators were rejected because they failed a 20,000 V wet test. These were soon replaced with wet process porcelain insulators, which passed a 40,000 V wet test [Fig. 6.7].[82]

At the Buffalo end, the last 4000 feet was underground cable to the generating station of the Buffalo Railway Company on Niagara Street at Prospect Avenue [Fig. 6.8] where three 250-kW 11,000-V to 375-V transformers connected in delta supplied two rotary converters for street railway purposes. The rotary converters operated in parallel with the trolley company's steam engine driven 550-volt dc generators.[83] Service was inaugurated November 15, 1896. Overall efficiency was 79.6%.[84]

In 1896, protecting devices for transmission lines were conspicuous by their complete absence. The oil switch had not yet been conceived and there was no method known which could interrupt a short circuit on a line with the capacity at Niagara without shutting down the entire system. At Niagara lead fuses were used on the 2200-V side of the transformers and aluminum fuses on the 11,000-V side [Fig. 6.9]. At Buffalo 11,000-V aluminum fuses were used on the line side of the transformers and air circuit breakers on the load side of the rotary converters. The fuses proved to be totally inadequate and were removed. The only alternative was to shut down the entire system by causing the generator field circuit breakers to trip with a persistent short circuit. Air break switches were used for synchronizing and disconnecting but were useless to interrupt short circuits.[85] Years ago an employee related to the author how he been told that when a Niagara Falls operator opened an air break switch, another man stood by with a pail of sand to quench the arc.[86] Lightning was a problem. Initially the pole line had a ground wire made of iron barbed wire above the phase conductors. After ground wire breaks caused outages, the ground wire was removed. Early lightning arresters failed to interrupt the arc.[87]

Figure 6.10 shows the Niagara Falls Power Co. distribution system in 1897. The local Niagara Falls load was supplied 2200 V by two-phase four-wire or single phase two-wire and consisted of a mixture of ac and dc applications plus motors and lighting. The Buffalo electric trolley load was less than 2,000 hp.[88]

Niagara Falls customers objected to having their electricity interrupted for faults on the Buffalo line.[89] Continuity of service requires some means be used to disconnect defective portions of the transmission system. As the Niagara Falls load grew more units were added and it became possible to sectionalize the 2200-V bus at Niagara to supply the Buffalo load from separate generators [Fig. 6.11].[90]

Electricity Distribution Within Buffalo

During 1897 the Cataract Power & Conduit Company started a project to increase the distribution of Niagara power within the City of Buffalo. The Niagara Falls Power Company placed a second circuit on the Niagara – Buffalo pole line shown in Fig. 7.1 near Riverside Park in North Buffalo. A small terminal house was built on the bank of the Erie Canal near the foot of Brace Street [Fig. 7.2]. The terminal house contained lightning arresters and single blade switches for changing connections of overhead and underground lines.[91]

Environmental and safety concerns about the proliferation of overhead telegraph, telephone and electric wires caused the City of Buffalo to pass an 1892 ordinance that not only prohibited the installation of additional poles on city streets but also required the removal of existing poles [Fig. 7.3].[92] It also limited the voltage to 5,000 V.  Therefore additions to the Cataract Power 11,000-V transmission system had to be placed in underground conduit lines.

Conduit lines consisting of concrete encased three inch inside diameter glazed clay tiles were installed under city streets from the terminal house to four trolley company stations [Fig. 7.4].[93] The conduit line on Niagara Street consisted of 25 tiles arranged in five rows of five.[94] Conduit lines were also installed to Cataract Power Stations 2 at South Park and Indiana and 3 at Wilkeson and Mohawk [Fig. 7.5].

Although oil-impregnated, laminated paper-insulated, lead-covered cable had been invented in 1890, the power company was doubtful. They had Dr. Habershaw of the India Rubber & Gutta Percha Company develop a three-conductor, 11,000-V cable with #3/0 American Wire Gauge stranded-copper conductors, rubber insulation and a lead cover [Fig. 7.6].[95] Ozone breakdown of the insulation at the cable terminations was a problem until a compound filled ‘pothead’ was developed.[96]

The Buffalo load grew slowly. Quoting from Adams ‘Niagara Power’ book, “It was recognized that the old-time manufacturer hesitated to give up his personal supervision of his own supply of power, however crudely and efficiently applied, and to take in its place a comparatively delicate piece of machinery he did not understand, that was activated by a wire, the operation of which was startling to hear, dazzling to see, and dangerous to touch.”[97]

By 1900 the Buffalo load was growing faster. A third circuit was built on a new wood pole line as shown in Fig. 7.7 with a two-horsepower line crew wagon. It had 500,000-cmil stranded aluminum conductors with longer spans and insulators with larger diameter wood pins. The original pole line had been designed for ½ inch ice on the conductors but experience had shown ice did not adhere to conductors carrying current. Ice formation on conductors is an important consideration today.

The voltage on the Niagara – Buffalo lines was raised to 22,000 V by reconnecting the transformer windings at Niagara. Terminal House A was built in North Buffalo on Niagara Street at Ontario for the installation of 22,000-V to 11,000-V oil-insulated, water-cooled transformers [Fig. 7.8]. Fig. 7.9 shows a schematic of Terminal House A with the three lines from Niagara, the transformers and outgoing cables to Cataract Power and trolley company substations. Improved air-break switches and lightning arresters and the use of recently developed oil switches, such as the 2200-V four-pole oil switch at Niagara shown in Fig. 7.10, was a big step forward. Time overcurrent relays like the one shown in Fig. 7.11 and reverse current relays enabled short-circuited elements to be removed from service without shutting down the whole system. Note the clockwork mechanism; a key was used to wind the spring and the amount of time delay was set by varying the pitch of the two blade air paddle. Modern relays are all electronic.[98]

Four 11,000-V, #3/0-AWG copper conductor rubber-insulated cables and one paper-insulated cable connected Terminal House A to the Cataract Power stations and the trolley company’s stations. Oil sectionalizing switches were installed on the cables about every mile to aid in cable failure location [Fig. 7.12]. At Stations 1, 2 and 3, Cataract Power owned transformation from 11,000 V to 2200 V which was distributed underground and overhead to customers for use in malt houses, grain elevators, machine shops, dry docks, bakeries, tanneries, etc.

11,000 V was also transformed to 360 V which was used in an adjacent building by Buffalo General Electric [Fig. 7.13] for motor generator sets and rotary converters for four different kinds of service:

1. Constant current dc for street arc lighting.

2. 62 ½ Hz (two-phase four-wire) for incandescent and arc lighting. Three phase machines were first used in 1914.

3. Three wire 110/220 V dc for the downtown district Edison System.

4. 500 V dc for power to motors and elevators. (500 V had previously been supplied by steam engine driven generators).

Years ago a retiree told me that each station had two operators on duty: the Cataract Power operator worked an 8 hour shift, and the Buffalo General Electric operator worked a 12 hour shift.[99]

Storage batteries were installed at some trolley company and Buffalo General Electric stations to help carry peak dc loads and provide backup for equipment outages [Fig. 7.14].[100] With continuity of service assured, Buffalo General Electric abandoned its steam plant.[101]

A major user of electricity from May to November 1901 was the Pan American Exposition. The map [Fig. 7.15] shows the route of the transmission lines from Niagara Falls and the location of the Exhibition in Buffalo but does not show how 11,000 V was transmitted from Terminal House A to the Electricity Building on the Exhibition grounds for the 5,000-hp electrical load. 200,000 eight-candlepower incandescent lamps were used [Fig 7.16]. Three water rheostats were used to bring the exterior lamps up to full glow in 80 seconds to create the Pan-Am’s most spectacular visual effect.[102]

Early Power Company Interconnections

As the load increased, Power House 2 at Niagara was constructed on the east side of the inlet canal [Fig. 8.1]. It contained eleven 5,000-hp machines installed between October 1902 and March 1904 [Fig. 8.2]. Increased efficiency was obtained by using Francis type turbines with draft tubes. The International Paper Company was the only industry to lease water from the canal and use it for mechanical power as originally envisioned by Evershed.[103] General Electric produced the 2200-V two-phase generators. Units 11-15 in the foreground of Figure 8.2 had external revolving fields and units 16-21 at the rear had internal revolving fields.[104]

An interesting event occurred on May 31, 1902 when Power House 1 at Niagara had to be shut down in order to remove the bulkhead in the tailrace tunnel leading to Power House 2 [Fig. 8.3]. To provide the minimum current required by important customers, the Buffalo Railway Company started up its steam plant. By using the system in reverse, the rotary converters and transformers converted the railway company’s 550 V dc to 11,000 V ac for local distribution and at Terminal House A transformed to 22,000 V for transmission to Niagara Falls.[105]

To plan for increasing load, the Niagara Falls Power company purchased all the stock of the Canadian Niagara Power Company, which had water rights for 100,000 hp and a favorable location just above the Horseshoe Falls within Queen Victoria Park in Niagara Falls, Ontario [Fig. 8.4 & 8.5]. Work commenced in May 1901 and the first unit was in commercial operation on January 1, 1905. Plant construction was similar to the Niagara Falls Power plants except the units were 10,000 hp and generated at 12,000 V three-phase, the largest size and highest voltage then constructed [Fig. 8.6].[106]Multiple three-conductor #3/0-AWG paper-insulated, lead-covered cables placed under the roadway of the Upper Steel Arch Bridge connected the Canadian and American powerhouses with an initial capacity of 10,000-hp [Fig. 8.7][107]

By 1906 Terminal House A had almost reached the limit of its transforming capacity of 40,000 hp including 30,000 for distribution and 10,000 held in reserve to protect continuity of service.[108] Terminal House B was built at Niagara and Busti to receive 25,000 hp from the Canadian Niagara plant via overhead 22,000 V transmission lines that crossed the Niagara River at Ft. Erie [Fig. 8.8 & 8.9]. Oil-insulated water-cooled transformers at Terminal House B transformed from 22,000 V to 11,000 V for connection to the Cataract Power 11,000-V underground transmission system. Figure 8.10 shows the control room. In 1925 the transformer high voltage windings were reconnected from delta to wye to increase the voltage to 38,000.[109] Figure 8.11 shows the synchroscope and voltmeters that were used by the Terminal B operator to aid in synchronizing the lines from Canadian Niagara to the Terminal House B 11,000-V bus.

Cataract Power also obtained 5,000 hp from the Electrical Development Company of Canada, which was located upstream from the Canadian Niagara powerhouse [Fig. 8.12, 8.13 & 8.14]. It was similar in design to Canadian Niagara except the tailrace tunnel came out behind the Falls and was designed to break off as the Falls receded.[110] The Electrical Development powerhouse started operation on May 28, 1907. Power was delivered to the Canadian Niagara powerhouse for delivery to Buffalo.[111]

As the Buffalo load grew, more distribution stations No. 4 through No.15 were added.

Station 7 is of interest because it was underground and was the first station built entirely by Buffalo General Electric. The same two gentlemen who started up the station in 1904 shut it down in 1924 to make way for the Liberty Bank Building.x

Stations 2, 3, 7, 8, 9 and 10 supplied the dc Edison System in the downtown business district of the city.  Station 7 is of interest because it was underground and was the first station built entirely by Buffalo General Electric. The same two gentlemen who started up the station in 1904 shut it down in 1924 to make way for the Liberty Bank Building.[112]   Station 9  located in the basement of the Electric Building contained batteries to support the Edison System during peak loads or contingencies. 

Station No. 11 on Electric Avenue in Lackawanna was supplied 11,000 V from Niagara, Lockport & Ontario Power Company’s Gardenville Station located southeast of Buffalo. Power was obtained from the Ontario Power Co. generation station located in Canada in the Niagara Gorge just below the Horseshoe Falls [Fig. 8.22]. Figure 8.23 shows the plant as seen from Goat Island. The first three 187 ½-rpm 12,000-V three-phase 25-Hz 10,000-hp horizontal generators driven by twin reaction turbines were placed in service July 1, 1905 [Fig. 8.24].[113]

Two transmission lines transmitted power to Lockport in 1905 and 154 miles to Syracuse in 1906 [Fig. 8.26]. The voltage was raised to 60,000 V in 1907. This was the highest voltage and longest transmission line in service at that time.[114] Two 60,000-V lines were later built from Lockport to Gardenville where single-phase 60,000-V to 11,000-V water-cooled transformers were installed indoors.[115] Note the 1907 style 60,000-V wall bushings which consist of a piece of glass installed in an inclined clay sewer tile. The conductor passed through a hole in the center of the glass. Porcelain bushings would be used today.

Niagara Falls Water Diversion Limitations Result in Steam Station Construction

The diversion of water from Niagara Falls by the two power companies on the American side and four companies on the Canadian side became an environmental issue.

In 1906 Congress passed the Burton Act that limited the amount of water the American plants could divert from the Niagara River above the Falls [Fig. 9.1]and limited the amount of power that could be imported from the Canadian plants [Fig. 9.2]. A 1910 treaty with Great Britain essentially reinforced these limits.[116] In order to increase efficiency, the original double runner turbines in Niagara Falls Power Co. Power House 1 were replaced between 1910 and 1913 with Francis inward flow turbines and draft tubes.[117] In the 1920’s the generators in Power House 1 were rewound for three phase 12,000 V.[118]

With increased demand for power and no more available from Niagara Falls, Buffalo General Electric started construction in January 1916 of a coal fired steam generating station on the Niagara River about a mile north of the City of Buffalo [Fig 9.3].

Originally called the River Station it was renamed the ‘Charles R. Huntley Station’ in 1926 following the death of the Buffalo General Electric president [Fig. 9.4].[119]

The plant initially consisted of three 20,000-kW, 25-Hz, 12,000-V, 90% power factor generators placed in service in November 1916 and February and March 1917. The 1500-rpm steam turbines operated at 250 pounds-per-square-inch and 675 degrees F [Fig. 9.5]. There were eight stoker-fired boilers and two smokestacks. All the auxiliaries were steam operated; the fans and pumps by turbines, and the stokers by reciprocating engines. A kilowatt-hour of electricity required approximately 2.2 pounds of coal. Modern power plants require less than three-quarters of a pound of coal per kilowatt-hour.

Figure 9.6 shows the main and auxiliary switchboard panels. The plant was connected to Terminal House A by multiple three-conductor paper-insulated lead-covered cables.

The author worked at Huntley the summer of 1952 and had the Company photographer take this photo of the turbine nameplate on Unit 1. He thought the phrase “Licensed to be used for all purposes except as a prime mover for marine and aerial craft” was quite amusing [Fig. 9.7].

Over the years as the load increased additional units were added:

Unit 4 35,000 kW 90% pf December 1919

Unit 5 60,000 kW 90% pf November 1926

Unit 6 75,000 kW 90% pf November 1928

Unit 7 75,000 kW 80% pf August 1930

Four more stoker-fired boilers and an additional stack were added for Unit 4. Ten boilers and three more stacks were added for Units 5, 6 and 7 [Fig. 9.8]. These ten boilers burned pulverized coal and were more efficient than the stoker-fired boilers; however all boilers fed a common header and steam conditions for all turbines remained at 250 pounds-per-square-inch and 675 degrees F.[120]

In 1917 during the World War, a power shortage caused by restrictions on the export of power from Canada required the International Railway Company to curtail trolley service on the Niagara Frontier. To alleviate the shortage the IRC installed a second hand steam turbine with a 5,500-kW 3-phase 25-Hz 11,000-V generator at its steam plant.[121] In November 1921 the increased supply of power permitted the IRC to shut down their steam plant.[122]

Hydroelectric Reorganization to Increase Efficiency

In early 1918 the Federal Government determined that conditions resulting from the World War and the national welfare required utilization of waters diverted from the Niagara River at an increased efficiency. The plan required the consolidation of the two power companies and a Niagara Falls distribution company in October to form The Niagara Falls Power Company (1918) [Fig. 10.1].[123]

The Hydraulic Power Company (Schoellkopf interests) and its predecessor had leased water to industries on the riverbank and supplied mechanical and electrical power to Niagara Falls customers for many years. Over the years the Hydraulic Canal had been widened to 100 feet and additional hydroelectric stations added.[124] In 1918 Hydraulic Power had in operation its Stations 2 and 3 [Fig 10.3]. Station 2 was started in 1895 and completed in 1904. It had 19 units totaling about 34,000-hp. Station 3 was started about 1904 and completed in 1914. It had thirteen 10,000-hp turbines with horizontal shafts driving generators. The power company owned eight 12,000-V 25-Hz generators like the ones in the foreground of Figure 10.3. Five turbines at the far end of the station each drove two dc generators owned by the Aluminum Company of America; thus the power company continued to sell mechanical horsepower.[125]

In January 1917, the War Department issued a permit to the Hydraulic Power Company to increase the authorized diversion from the Niagara River for power purposes from 6,500 cubic-feet-per-second to 8,785-c.f.s.[126] Construction was started on Station 3B with three vertical 37,500-hp turbine-generator units which were completed in 1920. Hydraulic Power Company turbines used a head of 210 feet whereas Niagara Falls Power turbines used a head of only 140 feet due to the slope of the tailrace tunnel.[127] Following the consolidation of the companies, the original Niagara Falls Power Houses 1 and 2 were renamed Adams Stations 1 and 2 and the Hydraulic Power Stations 3A and 3B were renamed Schoellkopf Stations 3A and 3B.

Following the March 1921 issuance of Federal Power Commission License No. 1 to divert 20,000 c.f.s. for 50 years, the consolidated Niagara Falls Power Company proceeded with the installation of three 70,000-hp units in Station 3C at the Schoellkopf site. The units were placed in service in 1924. Because it was impractical to enlarge the Hydraulic Canal, Station 3C units were furnished with water from a pressure tunnel. Figure 10.6 shows Station 3C generators in the foreground and Station 3B generators in the background. Adams Stations 1 & 2 were shut down and placed in reserve.[128]

In 1923 power from Schoellkopf was sent across Grand Island to Buffalo by a double circuit 60,000-V line with 500,000-cmil copper conductors supported by steel towers Fig. 10.7]. Transformation from 60,000 V to 22 000-V was at Terminal Station C located adjacent to the Huntley Station. Underground cables connected Terminal Station C to Terminal House A.[129] This brought Schoellkopf power to Buffalo. 22,000-V underground cables were installed to distribution stations and customers in the northern section of the City to convert them to 22,000 V.

It would appear that a change to 22,000 V had been contemplated for some time. The nameplate on a three-phase water-cooled 2810-kVA transformer in service at Station 12 until 2006 has a patent date of 1918 [Fig. 10.8]. The high voltage windings can be connected 11,500delta, 19,920Y or 23,000delta. The low voltage windings can be connected 2400delta or 4150Y.[130] It is interesting to note that some of the cables suitable for the 11,000-V ungrounded system were cut over to the 22,000-V grounded neutral system and operated satisfactorily for almost 50 years.[131]

Types of Electric Service available in Buffalo

An October 1921 Buffalo General Electric magazine called ‘The Welder’ states that 25-Hz service for power was generally available in all parts of the City.  Other types of service were confined to certain sections of the City as shown in Figures 11.1, 11.2, 11.3 & 11.4:[132]

This 1921 magazine also noted “only 61% of the employees of the B. G. E. Company live in wired homes.”[133]

In 1923 Buffalo General Electric started a project in Buffalo of installing electric streetlights to replace 10,000 gaslights like the one shown in Figure 11.5 with a two-piece cast iron standard.[134] While many of the cast iron gas standards were converted to electric streetlights, most were replaced with the type standard shown in Figure 11.6.

Note that all the power supplied to the City of Buffalo was from facilities located in the northwest sector of the City [Fig. 11.7]. This required a very extensive 11,000-V and 22,000-V cable system to distribute power to the distribution stations and customers scattered around the City. To supplement these sources, 60,000-V to 22,000-V Terminal Station D was built on Bailey Avenue south of William and placed in service July 1926 [Fig. 11.8]. A double-circuit 60,000-V overhead transmission line from Terminal Station C supplied Terminal Station D. 22,000-V cables were installed to pickup substations and customers in the southeast section of the City.[135]

Distribution substations No. 16 through No. 20 were built for 22,000 V.

Synchronous condensers for power factor correction were installed in several stations. A synchronous condenser is a synchronous motor running at no load with the field adjusted so the armature takes a leading current. 

Not all businesses were sold on central station electric service.

For example the author was told the Ellicott Square building [Fig11.14] generated electricity in the winter when they operated steam boilers for heating, and purchased electricity from Buffalo General Electric in the summer.[136] The Larkin Company [Fig. 11.15]did not stop generating electricity until 1930.[137]

Hotel Statler [Fig. 11.16], which was built in 1923, used reciprocating steam engine driven ammonia compressors for air conditioning and making ice until about 1970. This required the hotel to operate steam boilers year round.[138]

The City of Buffalo’s Col. Ward Pumping Station [Fig. 11.17] at the foot of Porter Avenue kept these huge steam pumps in reserve until about 1970. Electric pumps are in the foreground.[139]

60-Hz Replaces 25-Hz

This brings us up to 1930 when another great event took place, the start of the 60-Hz system in Western New York and the conversion from 25-Hz to 60-Hz. As outlined below, the conversion in Buffalo took 76 years [Fig 12.1]. (Refer to the two-part article '25-Hz at Niagara Falls - end of an era on the Niagara Frontier' in the Jan/Feb and Mar/Apr 2008 issues of IEEE Power& Energy magazine; author’s recollections.)

1947 - The beginning of end of the 25-Hz system when the company announced no new 25-hz customers [Fig. 12.2]. In 1949 the last arc lights were discontinued. They were on Main Street in downtown Buffalo.[140]

1952 - Western Division 60-Hz peak load exceeded the 25-Hz peak load [Fig12.3]. In 1956 the Buffalo downtown dc Edison System was shut down.

1956 - Schoellkopf disaster which destroyed Stations 3B and 3C [Fig. 12.4]. 25 Hz was still available from other sources but at a higher cost. In the 1960’s the Shredded Wheat Company in Niagara Falls was the last two-phase four-wire customer.

1998 - New York Public service Commission approves the elimination of the 25-Hz system by December 31, 2007 [Fig. 12.5]. Customer contributions were required if repairs exceed $25,000. In 2002 the company initiated an incentive program that provided a limited matching grant to retrofit customer equipment for 60-Hz operation

2006 - On October 12 at 8:53 pm, 66-kV transmission conductors came down during the ‘October Surprise’ snow storm. The five remaining customers elected not to contribute to the cost of repairs. Thus ended almost 110 years of 25-Hz service in Buffalo [Fig. 12.6}.

Contributions of Five AIEE Presidents

It is important to note the contributions of five men associated with the Cataract Construction Company who became presidents of the American Institute of Electrical Engineers, one of the predecessors of the Institute of Electrical and Electronics Engineers.

Dr. Arthur E. Kennelly, President 1898-1900 -- hired as a consultant 1894 and 1895 concerning the radius of electric power distribution that might be considered reasonably profitable by the use of high-voltage alternating current [Fig. 13.1].[141]

Charles F. Scott, President 1902-1903 --  Westinghouse electrical engineer – developed the ‘Scott connection’ for connecting two single phase transformers to convert two-phase four-wire current to three-phase three-wire [Fig. 13.2]. Technical consultant to Edward Dean Adams during the writing of his two-volume ‘Niagara Power’.[142]

Lewis B. Stillwell, President 1909-1910 -- In March 1897 resigned his position as chief electrical engineer and assistant manager of the Westinghouse Electric & Manufacturing Co. to become Electrical Director of Cataract Construction. Resigned in September 1900 after the completion of Power House 1 [Fig. 13.3].[143]

Paul M. Lincoln, President 1914-1915 -- Westinghouse engineer - joined Cataract Construction 1896 to 1902 as operating superintendent and later as resident electrician [Fig. 13.4]. Involved with Power House 1 and transmission to Buffalo. Invented the synchroscope [Fig. 13.5]. Returned to Westinghouse and later became Professor-Director in charge of Department of Electrical Engineering at Cornell.[144]

Harold W. Buck, President 1916-1917-- Engineer with General Electric. Electrical Engineer for Cataract Construction September 1901 to December 1907 in responsible charge of the allied power companies [Fig. 13.6]. He was instrumental in the development of suspension type insulators [Fig13.7].[145] All prior insulators were pin type. 

1925 Residential Electric Bill

You may get a chuckle out of the first electric bill for the author's father (Harry Woodworth 1893-1970) for 2-wire 110-V 25-Hz service in the Riverside section of Buffalo in 1925.

Figure 14.1   The address side of the bill. Note Niagara Mohawk-National Grid predecessor ‘Buffalo General Electric Company’. The address is the Electric Building; the entrance was later changed from 33 Genesee St. to 535 Washington St.

Figure 14.2   The Billing Side. Net bill was 5 cents. Note there was no minimum amount and no taxes and that this bill was calculated and posted by hand. Current bills are printed on several sheets of paper with all calculations by computer, which enables all the detailed charges including taxes. 

References

  1. A ditty repeated in the author’s youth by his father Harry Woodworth (1893-1970).
  2. “Engineering the Electric Century: Arc lights create first surge of demand for electricity on large scale,” Electrical World, March 15, 1973: 30-31.
  3. Alfred Morgan, First Electrical Book for Boys (New York: Charles Scribner’s Sons, 1940), 128.
  4. “Giants of the Electric Century 1874-1974: Charles Francis Brush, Pioneer of electric arc lighting” Electrical World, May 1, 1973: 35.
  5. Niagara Mohawk Power Corporation. The Niagara Mohawk Story (1823-1983): A Reference Manual of 160 Years of Niagara Mohawk Power Corporation and its Predecessor and Associated Companies, 2d ed. (Niagara Mohawk Power Corporation, Syracuse, NY, 1983, mimeographed), 67-69.
  6. Niagara Mohawk Story, 73.
  7. Niagara Mohawk Story, 71.
  8. Niagara Mohawk Story, 71.
  9. Niagara Mohawk Story, 75.
  10. “Engineering the Electric Century: Pearl Street Station inaugurates an era,” Electrical World, May 15, 1973: 33.
  11. Christopher S. Derganc, “Thomas Edison and His Electric Lighting System,” IEEE Spectrum, February 1979:56.
  12. “Engineering: Pearl Street,” 34.
  13. “Engineering the Electric Century: As dc distribution limits loomed, higher voltages of ac systems promised a solution,” Electrical World, June 15, 1973: 74.
  14. “Niagara Mohawk Story,” 69. “dc distribution limits,” 75. Charles A. Ruch, “A Young Westinghouse is Challenged,” Westinghouse Retirees’ News, March 1993:6. Edward Dean Adams, Niagara Power: History of the Niagara Falls Power Company 1886-1918, 2 vols., (Niagara Falls, NY: Privately printed for The Niagara Falls Power Company MCMXVIII, 1927), 2:170.
  15. “dc distribution limits,” 75.
  16. “The Copper Ring and the Senate Tariff Bill,” New York Times, 30 Nov 1888.
  17. Adams, Niagara Power, 1:116.
  18. Ibid., 141.
  19. Ibid., 120.
  20. Ibid., 119.
  21. Ibid., 122.
  22. Ibid., 94.
  23. Jill Jonnes, Empires of Light: Edison, Tesla, Westinghouse and the Race to Electrify the World (New York: Random House, 2003), 282-283.
  24. Adams, Niagara Power, 1:233, 292.
  25. Ibid., 292, 297.
  26. Ibid., 132.
  27. Ibid., 143.
  28. Ibid., 142.
  29. Ibid., 144-147. Adams, Niagara Power, 2:171.
  30. Adams, Niagara Power, 2: 221.
  31. Ibid., 203.
  32. Adams, Niagara Power, 1:152-156.
  33. Ibid., 163.
  34. Ibid., 173.
  35. Ibid., 395.
  36. Ibid., 187.
  37. Adams, Niagara Power, 2:219.
  38. Adams, Niagara Power, 1:363.
  39. Ibid., 187.
  40. Ibid., 413.
  41. Adams, Niagara Power, 1:164, 2:106.
  42. Adams, Niagara Power, 2:38, 48.
  43. Ibid., 174, 179. “Engineering the Electric Century: Transmission by ac gives impetus to hydro,” Electrical World, September 15, 1973: 72.
  44. Adams, Niagara Power, 2:106, 222.
  45. Ibid., 223.
  46. Ibid., 356.
  47. Ibid., 85.
  48. Ibid., 181.
  49. Ibid., 433.
  50. Ibid., 85.
  51. Ibid., 104.
  52. Ibid., 113.
  53. Ibid., 439.
  54. Ibid., 107.
  55. Ibid., 113.
  56. Ibid., 66.
  57. Adams, Niagara Power, 2:220. “dc distribution limits,” 76. Gardner Dales, “The Story of Nikola Tesla: The War of the Currents,” Tales from Gardner Dales (Western Division Historian, Niagara Mohawk Electric Company, n.d., photocopy), 17-22.
  58. “dc distribution limits,” 76. “Engineering the Electric Century: Polyphase ac systems come of age at the Columbian Exposition and Niagara Falls,” Electrical World, July 15, 1973: 30. Adams, Niagara Power, 2:193. Lewis B. Stillwell, “The Electric Transmission of Power from Niagara Falls,” Transactions of the American Institute of Electrical Engineers, 18, (1901): 457.
  59. George D. Shepardson, Electrical Catechism: An Introductory Treatise on Electricity and its Uses, 2d. ed., (New York, NY: McGraw-Hill Book Company, 1908), 387-390. “Polyphase ac systems,” 30.
  60. Adams, Niagara Power, 2:435.
  61. Ibid., 74, 182, 194, 233.
  62. Ibid., 227.
  63. Ibid., 233, 419.
  64. Ibid., 235.
  65. Ibid., 236.
  66. Ibid., 411-412.
  67. Ibid., 223-246.
  68. Ibid., 417.
  69. Ibid., 39.
  70. Ibid., 39.
  71. Ibid., 46.
  72. World Book Encyclopedia, 1971 ed., s.v. “aluminum.”
  73. Author’s calculation based on Ralph D. Mershon, “The Transmission Plant of the Niagara, Lockport and Ontario Power Company,” Transactions of the American Institute of Electrical Engineers, 26, Part II, (1907): 1277. Tower Department, Transmission Towers (Pittsburgh, PA: American Bridge Company, 1925), 171.
  74. Adams, Niagara Power, 2:39.
  75. Ibid., 247.
  76. Adams, Niagara Power, 1:340.
  77. Ibid., 1:339-340. Niagara Mohawk Story, 79.
  78. Adams, Niagara Power, 1:337.
  79. Adams, Niagara Power, 2:248.
  80. Ibid., 289. Stillwell, “Electric Transmission,” 497.
  81. Adams, Niagara Power, 2:287.
  82. Ibid., 274-275.
  83. Ibid., 275. Stillwell, “Electric Transmission,” 497.
  84. Adams, Niagara Power, 2:276.
  85. Ibid., 283-285. Stillwell, “Electric Transmission,” 497.
  86. Related to the author by Alex Graham, an NMP employee, ca. 1954.
  87. Adams, Niagara Power, 2:278.
  88. Ibid., 251. Stillwell, “Electric Transmission,” 497.
  89. Adams, Niagara Power, 2:284.
  90. Ibid., 284.
  91. Stillwell, “Electric Transmission,” 517.
  92. Related to the author by Jack Pfohl, NMP Electric Planner, ca. 1953.
  93. Harold W. Buck, “The Buffalo High-Tension Cable Distribution System,” Transactions of the American Institute of Electrical Engineers, 18, (1901): 836.
  94. Author’s recollection from personal observation during work as NMP Underground Engineer.
  95. Editorial Staff of the Edison Electric Institute Transmission and Distribution Committee. Underground Systems Reference Book (New York, NY: Edison Electric Institute,1957), xviii.
  96. Henry Gordon Stott, “The Distribution and Conversion of Received Currents,” Transactions of the American Institute of Electrical Engineers, 18, (1901): 136.
  97. Adams, Niagara Power, 2:7.
  98. Ibid., 287. Stott, “Distribution and Conversion,” 125-152. Stillwell, “Electric Transmission,” 517-522.
  99. Related to the author by 'Chappy' Beagent whose nephew 'Chappy' Aldrich was retiring, ca. 1954.
  100. Stott, “Distribution and Conversion,” 141-152. Buck, “Buffalo High-Tension,” 835-841. Charles Brand, “History of the 60 Cycle System” (Buffalo General Electric Company, Buffalo, NY, 1922, photocopy).
  101. Niagara Mohawk Story, 75.
  102. Buck, “Buffalo High-Tension,” 836. Daniel E. Nye, Electrifying America: Social Meanings of a New Technology, 1880-1940 (Cambridge, Massachusetts: MIT Press, 1992), 41-47. Thomas E. Leary and Elizabeth C. Sholes, Images of America: Buffalo’s Pan-American Exposition. (Charleston, CS: Arcadia Publishing, 1998), 47-60.
  103. Adams, Niagara Power, 2:255.
  104. Ibid., 2:116-117, 441-442.
  105. Ibid., 39-41.
  106. Ibid., 79-81, 442.
  107. Ibid., 291.
  108. Ibid., 292.
  109. Ibid., 79, 291-292, 294, 307.
  110. Adams, Niagara Power, 1:346.
  111. Robert D. Barnett, “The Industrial Archaeology of the Electrical Development Company Generating Station at Niagara Falls,” The Historical Technologist (Published by the Niagara Society for Industrial History, Bulletin No. 1, 1982). Robert D. Barnett, “Governors of the Electrical Development Co. Generating Station,” The Historical Technologist (Published by the Niagara Society for Industrial History, Bulletin No. 2, 1984). Buffalo News 4/2/1989.
  112. “Happenings” (An Annual Log from the Electric Operations Department, Buffalo General Electric Company, 1924, photocopy).
  113. Bartnett, “Industrial Archaeology,” 16-17.
  114. Niagara Mohawk Story, 105.
  115. Mershon, “Transmission Plant,” 1305, 1307.
  116. Adams, Niagara Power, 1:211, 215.
  117. Adams, Niagara Power, 2:125, 439, 455.
  118. Ibid., 419.
  119. Adams, Niagara Power, 1:349. Niagara Mohawk Story, 77-78.
  120. Niagara Mohawk Story, 77-79. Niagara Mohawk Power Corporation, “Basic Data on Power Supply” (Internal Correspondence, Niagara Mohawk Power Corporation, Syracuse, NY, 31 December 1950). Herbert Zangler, compiler, “Chronological History and General Description of Huntley Steam Station #1, Buffalo General Electric Company” (19 December 1939, photocopy [author suspects this was prepared for a Public Service Commission case]).
  121. William R. Gordon, 90 Years of Buffalo Railways, 1860-1950 (Buffalo, NY: International Railway Company, 1970), 103.
  122. Niagara Mohawk Story, 79.
  123. Niagara Mohawk Story, 41.
  124. Ibid., 25.
  125. Ibid., 25-26.
  126. Ibid., 29.
  127. Adams, Niagara Power, 2:109.
  128. Niagara Mohawk Story, 43. Adams, Niagara Power, 2:293.
  129. Ibid., 293. “Happenings” (An Annual Log from the Electric Operations Department, Buffalo General Electric Company, 1923, photocopy). “Power Company Opens New Unit on River Road,” The Riverside Review,7 February, 1923.
  130. Author’s 35 mm slide taken 13 November 2002.
  131. Cable Department Manhole View Records for Cable between Terminals B and C, (Records dated 1955, Niagara Mohawk Power Corporation, Buffalo, NY, n.d.).
  132. H. B. Alverson, “Our Systems of Distribution,” The Welder, Published by the Employees of the Buffalo General Electric Company, 1 No. 8 (1921):12.
  133. “Is Your Home Wired?” The Welder, Published by the Employees of the Buffalo General Electric Company, 1, No 8, (1921):27.
  134. Adams, Niagara Power, 2:292.
  135. “Happenings” (An Annual Log from the Electric Operations Department, Buffalo General Electric Company, 1926, photocopy).
  136. Related to the author by George Adams, NMP T&D engineer, ca. 1961.
  137. “Larkin Company Now Uses Niagara Power,” Power Events, Published by Buffalo, Niagara & Eastern Power Corporation, 5, No 2 (1930): 8.
  138. Author’s recollection from personal observation during work as NMP Underground Engineer.
  139. Author’s recollection from personal observation during work as NMP Underground Engineer.
  140. Related to the author by Jack Pfohl NMP Electric Planner, ca. 1953.
  141. Adams, Niagara Power, 1:282, 288. Adams, Niagara Power, 2:270.
  142. Adams, Niagara Power, 1:282, 288. Adams, Niagara Power, 2:270.
  143. Adams, Niagara Power, 1:284. Adams, Niagara Power, 2: 202-203, 287.
  144. Adams, Niagara Power, 1:287-288. Adams, Niagara Power 2:201-202. Paul M. Lincoln, “Synchronism and  Frequency Indication,” Transactions of the American Institute of Electrical Engineers 18, (1901): 255.
  145. Adams, Niagara Power, 1:285, 288. Adams, Niagara Power, 2:214, 283, 354.