Milestone-Proposal:International Standardization of G3 Facsimile in 1980

From ETHW

Docket #:2010-03

This Proposal has been approved, and is now a Milestone Nomination

This is a draft proposal, that has not yet been submitted. To submit this proposal, click on "Edit with form", check the "Submit this proposal for review" box at the bottom, and save the page.


Is the achievement you are proposing more than 25 years old?


Is the achievement you are proposing within IEEE’s fields of interest? (e.g. “the theory and practice of electrical, electronics, communications and computer engineering, as well as computer science, the allied branches of engineering and the related arts and sciences” – from the IEEE Constitution)


Did the achievement provide a meaningful benefit for humanity?


Was it of at least regional importance?


Has an IEEE Organizational Unit agreed to pay for the milestone plaque(s)?


Has an IEEE Organizational Unit agreed to arrange the dedication ceremony?


Has the IEEE Section in which the milestone is located agreed to take responsibility for the plaque after it is dedicated?


Has the owner of the site agreed to have it designated as an Electrical Engineering Milestone? Yes


Year or range of years in which the achievement occurred:

1980.

Title of the proposed milestone:

International Standardization of G3 Facsimile in 1980

Plaque citation summarizing the achievement and its significance:


In what IEEE section(s) does it reside?

IEEE Tokyo Section, Japan.

IEEE Organizational Unit(s) which have agreed to sponsor the Milestone:

IEEE Organizational Unit(s) paying for milestone plaque(s):

Unit: IEEE Tokyo Section
Senior Officer Name: Senior officer name masked to public

IEEE Organizational Unit(s) arranging the dedication ceremony:

Unit: IEEE Tokyo Section
Senior Officer Name: Senior officer name masked to public

IEEE section(s) monitoring the plaque(s):

IEEE Section: IEEE Tokyo Section
IEEE Section Chair name: Section chair name masked to public

Milestone proposer(s):

Proposer name: Proposer's name masked to public
Proposer email: Proposer's email masked to public

Please note: your email address and contact information will be masked on the website for privacy reasons. Only IEEE History Center Staff will be able to view the email address.

Street address(es) and GPS coordinates of the intended milestone plaque site(s):

NTT Cyber Communications Laboratory Group, Yokosuka-city, Kanagawa Japan. KDDI R&D Laboratories, Kamifukuoka-city, Saitama Japan.

Describe briefly the intended site(s) of the milestone plaque(s). The intended site(s) must have a direct connection with the achievement (e.g. where developed, invented, tested, demonstrated, installed, or operated, etc.). A museum where a device or example of the technology is displayed, or the university where the inventor studied, are not, in themselves, sufficient connection for a milestone plaque.

Please give the address(es) of the plaque site(s) (GPS coordinates if you have them). Also please give the details of the mounting, i.e. on the outside of the building, in the ground floor entrance hall, on a plinth on the grounds, etc. If visitors to the plaque site will need to go through security, or make an appointment, please give the contact information visitors will need.

The plates will be installed in buildings of the NTT Cyber Communications Laboratory Group and KDDI R&D Laboratories. These were the places where the G3 type facsimile research and development was performed. Moreover, those places are where the MR method was invented.

Are the original buildings extant?

Yes

Details of the plaque mounting:


How is the site protected/secured, and in what ways is it accessible to the public?

NTT Cyber Communications Laboratory Group, Yokosuka-city, Kanagawa Japan. KDDI R&D Laboratories, Kamifukuoka-city, Saitama Japan. The plates will be installed in the main entrances in the NTT Cyber Communications Laboratory Group and KDDI R&D Laboratories. Both laboratories conduct the introduction tours for students and the public frequently.

Who is the present owner of the site(s)?

The sites are owned by NTT Corporation and by KDDI Corporation, respectively.

A letter in English, or with English translation, from the site owner(s) giving permission to place IEEE milestone plaque on the property:


A letter or email from the appropriate Section Chair supporting the Milestone application:


What is the historical significance of the work (its technological, scientific, or social importance)?

The recommendation for G3 facsimile was issued by CCITT (now ITU-T) in 1980 with the aim of establishing an international standard for ‘Redundancy suppressing digital facsimile’ based on the newly developed MR (Modified READ) method after intense discussions and examinations under Japanese leadership with international cooperation.

What obstacles (technical, political, geographic) needed to be overcome?

The biggest issue was the related intellectual rights, but this was resolved when the Japanese delegates declared at the Kyoto meeting of CCITT that if the MR method was adopted as the international standard, the patents and property rights would be offered free of charge.

What features set this work apart from similar achievements?

G3 facsimile realized the one minute facsimile by adopting the MR method, the most advanced two dimensional encoding method developed through the collaboration of NTT and KDDI. It enabled the intercommunication of all facsimiles throughout the world. The rapid standardization precluded the market from being flooded with proprietary systems, while ensuring the freedom needed to compete with additional features and reduced cost. The rapid penetration of G3 facsimile proved these achievements.

References to establish the dates, location, and importance of the achievement: Minimum of five (5), but as many as needed to support the milestone, such as patents, contemporary newspaper articles, journal articles, or citations to pages in scholarly books. At least one of the references must be from a scholarly book or journal article.


Supporting materials (supported formats: GIF, JPEG, PNG, PDF, DOC): All supporting materials must be in English, or if not in English, accompanied by an English translation. You must supply the texts or excerpts themselves, not just the references. For documents that are copyright-encumbered, or which you do not have rights to post, email the documents themselves to ieee-history@ieee.org. Please see the Milestone Program Guidelines for more information.