Milestones:Kurobe River No. 4 Hydropower Plant, 1956-63: Difference between revisions
From ETHW
(New page: <p>''Kurobe River No. 4 Hydropower Plant, 1956-63<br><br>Kansai Electric Power Co., Inc., completed the innovative Kurobe River No. 4 Hydropower Plant, including the subterranean power sta...) |
(No difference)
|
Revision as of 14:13, 12 April 2010
Kurobe River No. 4 Hydropower Plant, 1956-63
Kansai Electric Power Co., Inc., completed the innovative Kurobe River No. 4 Hydropower Plant, including the subterranean power station and Kurobe Dam, in 1963. The 275kV long-distance transmission system delivered the generated electric power to the Kansai region and solved serious power shortages, contributing to industrial development and enhancing living standards for the population.