Milestones:Virginia Smith High-Voltage Direct-Current Converter Station, 1988: Difference between revisions
(Created page with "{{MilestoneLayout |pagename=Milestones:Virginia Smith HVDC Converter Station with Integrated AC Voltage Control Function |title=Virginia Smith High-Voltage Direct-Current Conv...") |
No edit summary |
||
Line 29: | Line 29: | ||
[[Media:IMG 3320-smoothing reactor.pdf]] | [[Media:IMG 3320-smoothing reactor.pdf]] | ||
}} | }} | ||
{{Milestone|GeoLoc=39.7070908, -105.1371014|Address=WAPA Corporate Headquarters Building, 12155 West Alameda Parkway, Lakewood, Colorado 80228 USA|Description=WAPA Corporate Headquarters Building, 12155 West Alameda Parkway, Lakewood, Colorado 80228 USA. Built by Siemens, owned and operated by Western Area Power Administration (US DOE), the 200 MW HVDC Virginia Smith Converter Station near Sidney, Nebraska, connected the eastern and western U.S. grids. Its core technology is an all solid-state converter with integrated steady-state, dynamic, and transient voltage control up to its full rating. The station was an important advance in HVDC technology and cost-effectiveness.|StartYear=1988}} | |||
[[Category:Fields, waves & electromagnetics|Franklin]] [[Category:Electricity|Franklin]] |
Revision as of 20:21, 21 May 2015
Title
Virginia Smith High-Voltage Direct-Current Converter Station, 1988
Citation
Built by Siemens, owned and operated by Western Area Power Administration (US DOE), the 200 MW HVDC Virginia Smith Converter Station near Sidney, Nebraska, connected the eastern and western U.S. grids. Its core technology is an all solid-state converter with integrated steady-state, dynamic, and transient voltage control up to its full rating. The station was an important advance in HVDC technology and cost-effectiveness.
Street address(es) and GPS coordinates of the Milestone Plaque Sites
WAPA Corporate Headquarters Building, 12155 West Alameda Parkway, Lakewood, Colorado 80228 USA, 39.7070908, -105.1371014
Details of the physical location of the plaque
The plaque will be hung on the wall in the atrium of the Western Area Power Administration (WAPA) headquarters building in Lakewood, Colorado.
How the plaque site is protected/secured
WAPA's atrium, where the plaque will be hung, is open to the public during normal business hours (Monday through Friday 8:00 am to 4.00 PM). This area is also protected by guards during these hours and monitored 24/7 by security cameras.
Historical significance of the work
The Virginia Smith HVDC Converter Station is the first interconnection between the eastern and western US ac grids without separate Static VAr Compensators (SVC). Special innovative converter control algorithms and equipment design features allow the converter to provide SVC functions for both ac buses. This new approach has been studied and confirmed in digital simulations and it has proven its validity in over 25 years of operation. The Station has increased the electric power availability and quality for industries and residents on both sides near the electric border.
Features that set this work apart from similar achievements
Two special features characterize the Virginia Smith HVDC Converter Station: In addition to regulating real power transfer at any MW level in either direction, the converter control offers dynamic reactive power control in response to ac voltage changes. Thus, ac voltage stability requirements are met without separate SVC on either ac bus. Dynamic overvoltage limitation is accomplished by parallel ZnO arresters switched with fast-closing breakers.
Significant references
Supporting materials
Media:IMG 1347-control desk.pdf
Media:IMG 3320-smoothing reactor.pdf